Straight answers to the questions we hear most at community sessions: about the technology, the land, safety, and what happens at the end of a project’s life. Specific information for individual projects (capacity, land use, timing) lives on each project’s page.

Battery energy storage overview

What is a BESS?

A Battery Energy Storage System (BESS) is a large-scale energy storage facility that stores and releases energy to the electricity grid. A BESS comprises several “enclosures” or battery units (broadly resembling a shipping container), inverters, transformers and other electrical equipment. A BESS site usually also includes access tracks, water tanks, site offices, amenities, landscape screening and security fencing.

Why do we need BESS?

Battery Energy Storage Systems (BESS) play a crucial role in maintaining the safe, reliable, and secure operation of Australia’s National Electricity Market. They provide fast, dispatchable energy that helps keep the electricity grid stable. A BESS stores electricity when there is excess generation (for example, during the middle of the day when solar production is high) and releases that energy when demand increases, such as in the early evening. This makes renewable energy sources like wind and solar more consistent and reliable.

Renewable energy is cheaper than new fossil fuel plants, cleaner to produce, and contributes far less to climate change. However, renewable generation is variable. The sun doesn’t shine at night, and the wind isn’t always blowing, while electricity demand also fluctuates throughout the day. Electricity use typically peaks in the early morning and again in the late afternoon and evening. During the middle of the day, demand drops, often at the same time solar generation is at its highest. This mismatch between when energy is produced and when it’s needed is one of the main challenges in a renewable-powered grid.

This is where a BESS comes in. It bridges the gap between supply and demand, storing excess energy when supply is high and delivering energy when demand exceeds available generation. In doing so, BESS helps make better use of renewable energy and supports a more stable, flexible electricity system.

As we move away from aging thermal coal fired power stations to renewable energy, this kind of technology is an important part of helping stabilise the grid as our state and national energy infrastructure undergoes significant change.

In many ways the modern Battery Energy Storage System is a contemporary use of technology to store excess renewable energy in the same way as the off-peak hot water storage technology of the 1960s and 1970s was used to store excess energy overnight from thermal coal fired power stations.

What type of BESS units will be used?

The design is still to be finalised; but lithium-ion is the preferred electrical storage technology because it is cost-effective and a proven technology which is readily available for utility broad scale deployment. During detailed design, the Original Equipment Manufacturer (battery supplier) will be confirmed through commercial tendering and procurement processes to ensure each project is optimised in terms of yield and efficiency, within the parameters of any planning approval.

This proven BESS technology is already in use across Australia.

Can we rely on these new technologies?

Utility-scale batteries are specifically engineered for long-term safety and reliability. Unlike mobile device batteries, which are designed to be lightweight and compact, utility-scale batteries are built for stability and long life.

In comparison, phone and tablet batteries are typically designed to last 2 to 3 years, or around 300 to 500 full charge cycles, before their performance starts to noticeably drop. This is because they’re built for portability, not long-term use. They are also more likely to wear out quickly due to constant use, frequent fast charging, and exposure to changing temperatures and humidity. Unlike utility-scale systems, these devices don’t have active systems to manage their environment, so the batteries are more affected by everyday conditions like heat, cold, and moisture.

Our projects, in comparison, are proposed for long-term use. Each battery unit has an initial life of 20–25 years depending on the project. Battery units will be replaced as and when they become life expired. The units themselves are containerised, making them easy to swap when they have reached the end of their life; an end-of-life unit can be processed by specialist recyclers to recover reusable components and raw materials.

The batteries are housed in secure, climate-controlled containers and are monitored constantly by systems that regulate heat, voltage, and other conditions to ensure safe operation. These safety measures significantly reduce the risk of overheating or fire. They are widely recognised for being one of the safest and most stable types of battery technology available. Please see the fire management FAQs for more information.

Environmental impact

Why was this site chosen for the BESS?

Each site is selected following careful consideration of planning, environmental, community, grid and commercial criteria. Typically, these are: proximity to a suitable existing grid connection point; a suitable planning context; low potential impacts to biodiversity and heritage; a relatively small development footprint; low land use conflict; low potential for noise affecting neighbours; and low potential for visual impact.

A BESS requires a connection to the electricity grid, which is most efficiently made through existing grid substations. For this reason, BESS facilities are typically located close to these substations. Each project page names its grid connection point.

What action will be taken to protect water quality and stormwater management?

Pacific Green is committed to protecting local water resources and to designing and operating each project in a way that maintains water quality and natural drainage patterns. Every project undergoes hydrology and stormwater assessment as part of its development application, and the design carries drainage and containment measures sized for the site.

We work with regulators, council and technical specialists throughout the planning process to ensure water quality and stormwater management outcomes meet or exceed the requirements that apply in each state.

In Queensland

Queensland projects are planned and managed in accordance with Queensland planning requirements, including PO16 to PO19 of State Code 27 for battery energy storage systems.

Will I be able to hear the BESS?

Once operational, the BESS may generate some noise depending on its mode of operation and the surrounding temperature. The main sources of noise include the inverter station, transformers, and cooling fans that regulate the battery temperature. The cooling fans typically produce a low whirring sound, similar to an air conditioning unit. While this noise can be heard when close to the facility, it quickly diminishes and becomes negligible at a distance.

Where required, the design will incorporate noise-reducing measures such as containerised inverter units and the potential use of acoustic barriers, so that each project complies with the noise requirements that apply in its state.

Due to site locations and the application of conservative mitigation strategies, operational noise is not expected to be audible to nearby residents. Noise levels also naturally reduce with distance from the source. Detailed noise assessments are completed for every project to evaluate potential impacts and confirm appropriate mitigation where required.

In Victoria

Operational noise is assessed against the Environment Protection Authority’s Noise Protocol.

In Queensland

Operational noise must comply with PO20 and PO21 of State Code 27.

Will there be any visual impact?

Inevitably, the installation of a BESS will have some effect on the current look of the landscape, though the BESS cubicles are unlikely to emit glare or reflection. The development application process consists of independent technical assessments, and visual impact is assessed as part of this. If required, BESS facilities can be screened (by either vegetative or artificial means) to minimise any potential visual impacts and comply with the applicable planning requirements.

Pacific Green is committed to working closely with the local community to address any concerns and encourages the community to approach us with any issues that may arise.

When will construction commence and how long will construction take?

The construction start date depends on several factors, including development approvals, selecting a construction contractor, obtaining grid connection approvals, negotiating a Power Purchase Agreement (PPA), and completing the financial close process. Each project page shows its expected construction window.

Once contractors are appointed, construction on site is typically anticipated to take approximately 18 to 24 months depending on the project. The most intensive phase will be when the battery units are delivered and installed. During this time, we will work closely with the community to manage traffic and minimise disruption, and we will keep the community updated as we progress toward construction.

How do you plan to manage traffic during the construction period so that it does not impact residents?

Appropriate technical studies are conducted as part of each development application, in line with the requirements that apply in the project’s state.

Traffic management plans will be in place during the construction period and residents will be notified ahead of time should there be any essential works or periods where access may impact traffic flow.

In Queensland

Traffic and transport outcomes are assessed against PO24 to PO28 of State Code 27.

What will happen to the residual land?

The remaining land will continue to be used for farming by the landowner. On our current projects, 100% of the land is used for agriculture today, and the BESS will occupy only a small portion of each property (typically between 1% and 5%), with the remainder staying in farming use with no change to it. Each project page shows its exact land-use split.

Technical

What does a BESS look like?

BESS are container-like modular systems, similar to shipping containers, grouped with multiple inverter stations that are configured based on site and capacity obligations. The containerised form of the BESS decreases installation and maintenance duration, enhances the electrical and environmental safety of the entire energy park, and minimises the impact on the original landscape. As technology improves, the systems are becoming increasingly efficient and more compact.

A project typically includes the following key built form features: the BESS itself (battery enclosures, inverters, transformers, switchgear and control room); an onsite substation including transformer switch bays and switchgear housed in portable substation containers; a connection to the existing nearby substation; permanent office, operation and maintenance (O&M) buildings, hardstands and project signage; site access and internal access tracks and parking; and stormwater management infrastructure, lighting, fencing and security.

How high will the units be?

BESS units will be installed on low-lying structures and are expected to not exceed 3 metres above the natural ground level. It is expected that the units will be at the same height or lower than other existing features in the landscape.

Will the BESS be lit up at night?

No, the BESS will not be brightly lit at night. Lighting will be limited to essential safety and security purposes, with no continuous or high-intensity illumination planned. Temporary lighting may be used during construction if required for safety, but this will be assessed on a case-by-case basis.

In general, BESS facilities are designed to minimise light pollution. They typically use shielded, downward-facing fixtures along with motion sensors and timers to reduce unnecessary lighting. Higher levels of lighting are only used in response to security incidents or in remote locations where there is no impact on nearby residents. These design measures help protect the night-time environment and limit disturbance.

Will there be outages during construction?

There will be no outages expected during the construction phase. Once the BESS is built and operational, it will increase grid stability.

Risk management

Are there health risks associated with electro-magnetic fields and living near a BESS?

EMFs (electro-magnetic fields) are naturally present in the environment. They are present in the earth’s atmosphere as electric fields, while static magnetic fields are created by the earth’s core. EMF are also produced wherever electricity or electrical equipment is in use (e.g. household appliances like fridges, and powerlines).

The use of electricity in daily life exposes us to low frequency EMF which is not considered a risk to human health (ARPANSA). Your kitchen stove has an EMF range of 2–30 milligauss (mG) and your hairdryer 1–70mG. Standing at the edge of a transmission powerline easement would be in the range of 10–50mG, and under a transmission powerline 20–200mG.

The current international standard for human exposure to limit EMF set by the International Commission on Non-Ionizing Radiation Protection (ICNIRP) is 2000mG (EnergyCo, 2022). EMFs from a BESS are typically less than household appliances and are not distinguishable from background levels at the site boundary.

Technical and engineering experts, including the Australian Radiation Protection and Nuclear Safety Agency (ARPANSA), have found no known or documented electromagnetic radiation impacts associated with big batteries.

Is there a fire risk?

Fire safety is a central consideration in the design of every project. Key safety features include adequate spacing between units and installation on gravel surfaces to reduce fuel loads and minimise the risk of fire spread.

Equipment such as heating, ventilation and air conditioning will safely maintain temperature conditions within BESS enclosures, including during high temperature conditions. Continuous remote monitoring of battery performance will detect and respond to any abnormal conditions, with the ability to isolate and shut down any batteries well before the risk of fire.

Asset protection zones and perimeter roads are incorporated into each design in accordance with the relevant fire authority’s guidelines for renewable energy facilities.

In line with best practice for fire management relating to a BESS, the recommended response in the highly unlikely event of a battery fire is a controlled, non-intervention approach. Emergency service personnel will be on-site and on standby during this event, allowing the affected unit to burn out under supervision while ensuring the fire does not spread to adjacent equipment (including adjoining batteries) or surroundings.

It is important to note that such scenarios are extremely rare, and every project incorporates multiple layers of safety to prevent and contain any such event. The likelihood of fires starting from other development types within the region (such as residential, commercial, agriculture, fuel and transport) far exceeds the potential associated with a BESS development.

Pacific Green works closely with the relevant fire authorities, who play a central role in reviewing and approving Fire Safety Studies and Emergency Response Plans. Where appropriate, we also support local emergency preparedness through the provision of relevant information, familiarisation, and where required, equipment and training.

In Victoria

Designs follow the Country Fire Authority (CFA) guidelines for renewable energy facilities.

In Queensland

Designs follow Rural Fire Service Queensland (RFSQ) guidelines for renewable energy facilities.

What happens in the case of a chemical spill?

BESS are engineered with multiple layers of protection to prevent and manage chemical spills. Each unit includes internal bunding (a built-in containment system) designed to capture and isolate any potential leaks. Containers are sealed at the base, and many systems include liquid-cooled bottom plates to further reduce the risk of leaks.

In the unlikely event of a fire, BESS are equipped with advanced detection systems (such as heat and gas sensors) that can automatically shut down the system before ignition occurs. Fire authorities do not use water to extinguish battery fires, helping prevent contaminated runoff from entering nearby soil or waterways.

In addition to physical design features, BESS operations are monitored and controlled by systems such as SCADA (Supervisory Control and Data Acquisition) and BMS (Battery Management System), which play a key role in identifying and managing chemical hazards. An Environmental Management Strategy will be in place to guide safe handling, containment, and emergency response procedures.

Site-specific design measures, such as appropriate drainage systems and hydrology reviews, will ensure any accidental release is contained and does not leave the site.

Will there be impacts to air quality?

Air quality, and the potential release of combustion by-products during a battery fire, is a recognised community concern. Every project must demonstrate that the risks associated with thermal events, including potential emissions, are appropriately assessed and mitigated.

A commonly referenced incident is the 2021 Victorian Big Battery fire in Geelong. The fire originated within a single lithium-ion unit during commissioning and spread to an adjacent unit. Emergency response protocols were enacted, and the event was contained to two units with no injuries or explosions reported. Importantly, EPA Victoria deployed mobile air quality monitors within 2 km of the site, measuring hydrogen fluoride, carbon monoxide, particulate matter and volatile organic compounds. The EPA confirmed ambient air quality remained within acceptable limits and no lasting environmental or health impacts were identified (Fisher Engineering, 2022).

Pacific Green adopts contemporary BESS design and risk controls. A detailed Fire Safety Study and quantitative risk assessment is undertaken for each project to: assess credible thermal event scenarios; confirm appropriate separation distances to sensitive receptors and nearby infrastructure (including gas assets); demonstrate compliance with the relevant state fire and environmental requirements; and identify and implement mitigation measures, emergency procedures and monitoring protocols.

In Queensland

Under State Code 27 (Battery Energy Storage Systems), proponents must demonstrate that risks associated with thermal events, including potential emissions, are appropriately assessed and mitigated, and that the design meets the code’s performance outcomes.

Is the site affected by flooding?

Comprehensive assessments are undertaken to evaluate whether each site is susceptible to flooding. These assessments include traffic and hydrology investigations as part of the development application process, which confirm the suitability of the site and access road under heavy rainfall conditions, including any mitigation measures which may be required.

Pacific Green collaborates closely with technical experts to ensure that any potential impacts on neighbouring properties are minimised. While the likelihood of significant stormwater flooding is low, the design of the BESS will incorporate measures to ensure its infrastructure remains stable and secure.

Social & economic

Will neighbouring insurance premiums be impacted by the development?

Based on available information, there is no indication that the development of energy infrastructure will have a direct impact on neighbouring insurance premiums. As confirmed by the Insurance Council (May 2024), there have been no reported cases where their members have denied coverage or increased premiums solely due to the presence of energy infrastructure on a property or nearby.

The Clean Energy Council similarly highlights that any adjustments to insurance premiums are unlikely to be directly tied to clean energy developments. Instead, rising insurance costs are largely driven by broader factors, including the escalating frequency and costs of natural disasters, inflation affecting building and vehicle repair expenses, the increasing value of homes and vehicles, and higher operational costs for insurers.

Will my house be devalued if a BESS project is nearby?

As grid-scale battery projects are relatively new in Australia, there is limited evidence to suggest any changes to property values or impacts on future land use opportunities.

Every project is designed to align with the mitigation measures recommended by its technical assessments, such as the Landscape and Visual Impact Assessment (LVIA) and Noise Impact Assessment (NIA), in accordance with the applicable state requirements. Construction and operational noise are predicted to comply with all relevant noise criteria, due to the scale of the projects and distance from receivers.

Nonetheless, we remain committed to minimising potential impacts that could influence property perceptions.

Will there always be a contact onsite in case of emergency?

The BESS will operate 24 hours a day, seven days a week and be monitored remotely (including CCTV), with regular infrastructure maintenance undertaken on-site. An operational and maintenance (O&M) contractor would be employed to operate each project (including maintenance, repair, troubleshooting, and monitoring).

Decommissioning

How long will these projects operate for?

The operational life of each project is expected to be up to 25–30 years, with refurbishment and repowering extending project life to 50 years. Once a BESS reaches its end of life, it will be decommissioned, and the land will return to its original condition, or be re-energised. At the end of life, the BESS will be removed with related infrastructure and the site restored to its original condition. The decommissioning requirements are set out within contracts with the landowner and within the approvals process.

What are the plans for decommissioning?

At the end of the BESS’s useful life, each project will be fully decommissioned. This will include: removal of all above-ground, non-operational equipment; removal of any underground equipment buried at a depth shallower than 0.5 metres; and cleanup of any residual contamination.

During decommissioning, we will assess options for repurposing the facility, re-using equipment, and recycling materials wherever possible. Any materials that cannot be re-used or recycled will be classified according to relevant guidelines and disposed of at an appropriate facility.

In Queensland

Decommissioning is carried out consistently with PO31 to PO35 of State Code 27.

What happens to batteries at the end of their life, and can they be recycled?

Lithium-ion batteries used in BESS are highly recyclable. Up to 95% of valuable materials such as lithium, nickel, cobalt, copper, aluminium, and iron can be recovered through specialised recycling processes.

In Australia, the battery recycling industry is growing rapidly. While current national recycling rates for lithium-ion batteries are still low (around 10%), this figure includes smaller consumer batteries. Larger BESS units offer significantly greater recycling value due to their size, concentrated material content, and ease of disassembly.

Organisations like CSIRO are leading research into battery recycling technologies, and government-backed programs such as B-cycle are supporting safe collection and processing. As of 2024, ten accredited and EPA-licensed recyclers are actively handling mixed battery waste across the country.

Manufacturers are also adopting take-back schemes for end-of-life systems, helping close the loop and reduce waste. With more utility-scale BESS expected to reach the end of life in coming years, continued investment in recycling infrastructure will be key to building a more sustainable and circular battery economy in Australia.

Didn’t find your answer?

Ask us directly. Call the community line or send a message and the project team will come back to you.