Gladstone West Energy Park

Pacific Green is developing the Gladstone West Energy Park which comprises four grid-scale co-located battery energy storage systems (BESS)

Up to 1,000MW / 8,000MWh (8 hour duration across four stages)

Sherwood Energy Park (Stage 1)

250MW / 2,000MWh (up to 8 hours duration)

Tamboora Energy Park (Stage 2)

250MW / 2,000MWh (up to 8 hours duration)

At a glance

Status
In consultation
Location
Gladstone region, Central Queensland
Grid connection
Powerlink Gladstone West Substation
Timing
Planned 24 months, operational end 2029
Artist impression of Gladstone West Energy Park

Artist impression: Gladstone West Energy Park

Project

About the project

As planning progresses, stage 3 and 4 will be developed.

Artist impression of Gladstone West

Timeline

Building Our Energy Future

The Gladstone West Energy Park is in the early project planning stages which includes proactive community engagement to inform the planning and approvals pathway. As part of this process, Pacific Green is completing preliminary feasibility and technical studies to ensure the project meets the requirements of State Code 27 and other planning approvals, there are minimal impacts to the surrounding community and environment during construction and operation, and the project can be built.

  1. 2026Site, Complete
  2. 2026Stakeholder Engagement, Complete
  3. 2026Planning & Design, Complete
  4. 2026Technical and Ecological, In progress
  5. 2027Cultural Heritage, Upcoming
  6. 2027Social Impact Assessment, Upcoming
  7. 2027Community Benefit Agreement, Upcoming
  8. 2027Development Application, Upcoming
  9. 2027Grid Connection Approval & Connection, Upcoming
  10. 2027Construction Commences, Upcoming
  11. 2028Registration, Upcoming
  12. 2029Energisation & Commissioning, Upcoming
  13. 2029Commercial Operation, Upcoming
Artist impression of Gladstone West

Assessment

Technical Assessments & Approvals

Large-scale Battery Energy Storage System (BESS) projects in Queensland require development approval under the Planning Act 2016 (Qld). The development assessment process determines the suitability of the proposed land use having regard to the site context, environmental setting, community engagement, infrastructure interfaces and compliance with applicable State and local planning instruments.

Recent regulatory reforms in Queensland have introduced State Code 27 – Battery storage facility development. Under this framework, the assessment for large-scale BESS developments is undertaken by the State Assessment and Referral Agency (SARA).

Our Gladstone West Energy Park Project will follow an Impact Assessment pathway. This process includes statutory community engagement and a detailed technical review.

To support the approvals process, a comprehensive suite of technical, environmental and operational studies will be undertaken to demonstrate that the Project avoids, minimises and appropriately manages potential impacts and meets all statutory requirements. Key workstreams are expected to include (but may not be limited to):

  • Social Impact Assessment (SIA) and Community Benefit Agreement (CBA) framework
  • Planning and Development Assessment
  • Cultural Heritage Due Diligence
  • Landscape and Visual Impact Assessment
  • Noise and Vibration Impact Assessment
  • Hydrology and Flood Assessment
  • Biodiversity and ecological surveys
  • Traffic and Transport Impact Assessment
  • Natural Hazard Assessment including Bushfire
  • Agricultural Land Assessment
  • Battery Risk Assessment and Safety Management

In addition to these assessments, Pacific Green is committed to early, respectful and ongoing engagement with Traditional Owner groups.

In parallel with planning approvals, the Project must secure a Grid Connection Agreement with the relevant Transmission Network Service Provider (Powerlink Queensland), with the connection process subject to AEMO requirements under the National Electricity Rules.

Community

Community engagement

Pacific Green is dedicated to involving communities in the planning, construction and operation of battery parks across Australia. We deliver innovative energy storage solutions informed by local community input, skills and capabilities. We start engaging early to understand and act to minimise impacts and realise benefits throughout the operational life of our projects. We partner with communities where we deliver projects and support initiatives to develop wider social value creation beyond our core business.

How we engage

We provide current, accessible factual information about our projects and invite community input at every stage of the project. Our goal is to build respectful, transparent and lasting relationships with stakeholders, including Council, neighbouring landowners and the broader community. Our engagement approach is tailored to community preferences. We want to ensure that everyone has the opportunity to talk with us, ask questions, and provide feedback in a way that suits you.

Over the project’s development, our engagement activities will include:

  • Providing a range of opportunities for communities to meet us face to face – we go to you.
  • Hosting pop-ups and supporting local community events.
  • Delivering information letters to nearby landowners, one-on-one conversations, emails, using community channels to provide project updates.
  • Newsletters at key project milestones and updating our dedicated project web page.
  • Project community hotline and email.
  • Providing email updates to our stakeholder database throughout the planning process – please register to receive updates
  • Meeting key stakeholders regularly, including Gladstone Regional Council (GRC), Local Business Chambers (GEA, GCCI), regional emergency/health providers, and local progress associations
  • Undertaking community interviews to capture thoughts on key issues and as part of the Social Impact Assessment project.
  • Being present – being in the region, getting to know people and places.

We welcome the chance to meet with you and discuss the project in more detail. If you would like to arrange a conversation, please contact us using the contact form. We can meet in person at your residence, at a neutral location, or online, whichever option works best for you.

Our commitment to you

  • Our relationships within communities start from the early stages of a project and continue through to construction and operations

  • From the outset we focus on building open, transparent and collaborative relationships, and we are on the ground early to share our project plans, respond to questions and hear ideas the community might have to shape project design

  • Every community is different, and we value the time people take to engage with us as it helps us shape our projects in a way that suits the differing environments we operate in

Community Benefits

Pacific Green takes pride in becoming a positive participant in the communities in which we operate. As we expand our business across Australia, we actively seek opportunities to invest in and partner with value-aligned community groups and organisations. Our objective is to create genuine social value and contribute to stronger, more resilient regional communities.

In Queensland, our approach to community investment is aligned with the requirements of State Code 27 for Battery Energy Storage Systems, including the preparation of a Social Impact Assessment (SIA), and the establishment of a Community Benefit Agreement (CBA). These requirements ensure that community interests are properly understood, potential impacts are managed, and project benefits are shared in a transparent and structured manner before the development application is submitted.

We welcome input from local stakeholders on how project benefits could best be shared and would love to hear your ideas on how to share project benefits locally. If you have any suggestions on initiatives or programs that would support the local community, please reach out.

Local jobs & training

Pacific Green is committed to sustainably contributing to local employment and working with regional suppliers.

During construction of our projects, employment opportunities naturally peak and at these times our approach is to seek local employment and provide training opportunities. We prioritise hiring from within the local community to support regional economic development and growth.

Pacific Green welcomes expressions of interest from local companies seeking to support the development, construction and operation of the project.

Let us know

Community Feedback

We understand that not everyone prefers the same way of sharing their views, so we're offering a range of opportunities for you to have your say. Your feedback is important to us and will help shape the project as it progresses. We welcome input from all members of the community and will continue to offer flexible ways for you to share your thoughts throughout the project.

Please use our contact form if you want to give us your input or subscribe to receive project updates. You can also call or email us on the contact details below.

Safety & sustainability

The safety of our employees and the communities in which we operate takes precedence in all we do.

In addition to first-class technical engineering that’s designed to meet International Electrotechnical Commission (IEC) and Australian Standards (AS), all Pacific Green energy storage projects undergo rigorous safety and security testing to minimise safety risks.

The Gladstone West Energy Park will be equipped with the latest lithium-ion battery technology incorporating several integrated fire safety measures.

This will include both external monitoring and heat sensors as well as individual units within each battery container that are sealed and monitored with their own fire suppression systems. This means that if a single cell fails, this section of the battery is isolated and contained, thus protecting the rest of the container unit.

A Bushfire Management Plan (BMP) will be prepared to inform design of the Gladstone West Energy Park. The facility will also have a Risk Management Plan, Fire Management Plan and Emergency Management Plan developed in consultation with the Queensland Fire Department (QFD) and local Rural Fire Brigades, with details on potential risk areas and mitigation measures in place.

Would you like to ask us a question?

Contact us

Please use the form below if you would like to reach out by email.

Phone
toll-free number
1800 018 529

Fields marked * are required.

We collect your details to respond to your enquiry. They are shared only with the project team. Our email provider may store them outside Australia. See our privacy policy.