Pacific Green is developing the Kingswell Energy Park which is a grid-scale battery energy storage system (BESS)

500MW / 2,000MWh (4 hour duration)

At a glance

Status
In consultation
Location
South Burnett region, Queensland
Grid connection
Halys substation
Timing
Planned 24 months, operational 2029
Artist impression of Kingswell Energy Park

Artist impression: Kingswell Energy Park

Timeline

Building Our Energy Future

The Kingswell Energy Park is in the early phase of technical studies to underpin proactive community engagement and inform the planning and approvals pathway. As part of this process, we are seeking to finalise the concept design, informed by preliminary feasibility and technical studies. Pacific Green will complete a range of assessments and studies to ensure the project meets the requirements of State Code 27 and mitigates or minimises any impacts to the community and site during construction and operation.

  1. 2025Site, Complete
  2. 2026Cultural Heritage, Complete
  3. 2026Community, Complete
  4. 2026Planning & Design, Complete
  5. 2026Technical & Ecological, Complete
  6. 2027Equipment Procurement, Upcoming
  7. 2027GPS Approval & Connection, Upcoming
  8. 2027Construction Commences, Upcoming
  9. 2028Registration, Upcoming
  10. 2028Energisation & Commissioning, Upcoming
  11. 2029Commercial Operation, Upcoming
Artist impression of Kingswell

Assessment

Technical Assessments & Approvals

Large-scale Battery Energy Storage System (BESS) projects in Queensland require development approval under the Planning Act 2016 (Qld). The development assessment process determines the suitability of the proposed land use having regard to the site context, environmental setting, infrastructure interfaces and compliance with applicable State and local planning instruments.

Recent regulatory reforms in Queensland have introduced State Code 27 – Battery storage facility development. Under this framework, the assessment for large-scale BESS developments is undertaken by the State Assessment and Referral Agency (SARA).

Our Kingswell Energy Park Project will follow an Impact Assessment pathway. This process includes statutory public notification and detailed technical review.

To support the approvals process, a comprehensive suite of technical, environmental and operational studies will be undertaken to demonstrate that the Project avoids, minimises and appropriately manages potential impacts and meets all statutory requirements. Key workstreams are expected to include (but may not be limited to):

  • Social Impact Assessment (SIA) and Community Benefit Agreement (CBA) framework
  • Planning and Development Assessment
  • Cultural Heritage due diligence and engagement
  • Landscape and Visual Impact Assessment
  • Noise and Vibration Impact Assessment
  • Hydrology and Flood Assessment
  • Biodiversity and ecological surveys
  • Traffic and Transport Impact Assessment
  • Natural Hazard Assessment including Bushfire
  • Agricultural Land Assessment
  • Battery Risk Assessment and Safety Management

In addition to these assessments, Pacific Green is committed to early, respectful and ongoing engagement with Traditional Owner groups.

In parallel with planning approvals, the Project must secure a Grid Connection Agreement with the relevant Transmission Network Service Provider (Powerlink Queensland), with the connection process subject to AEMO requirements under the National Electricity Rules.

Community

Community engagement

Pacific Green is dedicated to creating a cleaner environment for our communities. We do this by delivering innovative energy storage solutions that enable Australia’s net-zero transition. Our presence in regions extends beyond the provision of clean energy solutions. We partner with communities where we deliver projects and support initiatives to develop wider social value creation beyond our core business.

Community Engagement Opportunities

We are committed to providing clear, accessible information and inviting community input at every stage of the project. Our goal is to build respectful, transparent and lasting relationships with stakeholders, including Council, neighbouring landowners and the broader community.

Residents living near the project site will be kept informed of key milestones, and Pacific Green will make every effort to share updates as our plans progress. We want to ensure that everyone has the opportunity to talk with us, ask questions, and provide feedback throughout the development process.

Over the project’s development, our engagement activities will include:

  • Delivering letters to nearby landowners, followed by one-on-one conversations
  • Providing email updates to our stakeholder database throughout the planning process
  • Holding briefings for a range of groups, including the Local Councils, Local Business Chambers and regional providers such as Accommodation, Health and Emergency Services, Education and Training and Community Groups and Service Providers.
  • Undertaking community feedback including through targeted Social Baseline and Impact Assessments surveys to capture your thoughts on key issues
  • Hosting information sessions for interested community members

We welcome the chance to meet with you and discuss the project in more detail. If you would like to arrange a conversation, please contact us using the contact form. We can meet in person at your residence, at a neutral location, or online, whichever option works best for you.

Our commitment to you

  • Our relationships within communities commence from the early stages of a project through to construction and operations

  • From the outset we establish open, transparent and collaborative two-way conversations that ensure we are on the ground early to share our project plans, respond to questions and hear ideas the community might have to shape project design

  • Every community is different, and we value the time people take to engage with us as it helps us shape our projects in a way that suits the differing environments we operate in

Pacific Green Community Benefits

Pacific Green takes pride in becoming a positive participant in the communities in which we operate. As we expand our business across Australia, we actively seek opportunities to invest in and partner with value-aligned community groups and organisations. Our objective is to create genuine social value and contribute to stronger, more resilient regional communities.

In Queensland, our approach to community investment is closely aligned with the requirements of State Code 27 for Battery Energy Storage Systems, including the preparation of a Social Impact Assessment (SIA), and the establishment of a Community Benefit Agreement (CBA). These workstreams ensure that community interests are properly understood, potential impacts are managed, and project benefits are shared in a transparent and structured manner.

Pacific Green works closely with each host community through comprehensive and ongoing stakeholder engagement. This two-way process informs the design of our Community Benefit Fund and ensures initiatives are locally relevant and responsive to community priorities. Through this approach, we aim to support meaningful, inclusive and sustainable outcomes in the regions where we operate.

We welcome input from local stakeholders on how project benefits could best be shared. We would love to hear your ideas on how to share project benefits locally, so if you have any suggestions on initiatives or programs that would support the local community, please reach out.

Local jobs & training

Pacific Green is committed to sustainably contributing to local employment and working with regional suppliers.

During construction of our projects, employment opportunities naturally peak and at these times our approach is to seek local employment and provide training opportunities. We prioritise hiring from within the local community to support regional economic development and growth.

Pacific Green welcomes expressions of interest from local companies seeking to support the development, construction and operation of the project.

Let us know

Community Feedback

We understand that not everyone prefers the same way of sharing their views, so we're offering a range of opportunities for you to have your say. Your feedback is important to us and will help shape the project as it progresses. We welcome input from all members of the community and will continue to offer flexible ways for you to share your thoughts throughout the project.

We welcome your feedback throughout all stages of the project and please use our contact form if you want to give us your input or you can call or email us on the contacts below.

Safety & sustainability

The safety of our employees and the communities in which we operate takes precedence in all we do.

In addition to first-class technical engineering that’s designed to meet International Electrotechnical Commission (IEC) and Australian Standards (AS), all Pacific Green energy storage projects undergo rigorous safety and security testing to minimise safety risks.

The Kingswell Energy Park will come equipped with the latest lithium-ion battery technology incorporating several integrated fire safety measures.

This will include both external monitoring and heat sensors as well as individual units within each battery container that are sealed and monitored with their own fire suppression systems. This means that if a single cell fails, this section of the battery is isolated and contained, thus protecting the rest of the container unit.

A Bushfire Management Plan (BMP) will be prepared to inform design of the Kingswell Energy Park. The facility will also have a Risk Management Plan, Fire Management Plan and Emergency Management Plan with details on potential risk areas and mitigation measures in place.

The battery has an initial lifespan of 20 years, but new generation cell technology will provide longer lifespan, so that the site can be renewed and enhanced continually, making the project sustainable into the future.

Would you like to ask us a question?

Contact us

Please use the form below if you would like to reach out by email.

Phone
toll-free number
1800 018 529

Fields marked * are required.

We collect your details to respond to your enquiry. They are shared only with the project team. Our email provider may store them outside Australia. See our privacy policy.