Nine Mile Energy Park

Pacific Green is developing the Nine Mile Energy Park which comprises two grid-scale co-located battery energy storage systems (BESS)

500MW / 1,500MWh

Nine Mile Energy Park (Stage 1)

250MW / 500MWh (2 hour duration)

Nine Mile Energy Park (Stage 2)

250MW / 1,000MWh (4 hour duration)

At a glance

Status
Approved
Location
Near Cressy, Victoria
Grid connection
Cressy Terminal Station
Timing
Planned 18 months, operational 2028
Artist impression of Nine Mile Energy Park

Artist impression: Nine Mile Energy Park

Timeline

Building Our Energy Future

The Nine Mile Energy Park is currently going through the final planning stages before construction begins. As part of this process, designs are being finalised for construction, informed by technical studies and stakeholder consultation. Pacific Green completed a range of assessments and studies as part of the Development Application. These assessments and studies demonstrate how the project will minimise any impacts during construction and operation.

Network connection

In addition to securing the planning permit, a grid connection agreement from the transmission network operator, AusNet is also required. This agreement must be approved by the grid manager, VicGrid, and regulator, AEMO.

Cultural Heritage management

Pacific Green is committed to working closely with the Eastern Maar Traditional Owners to ensure successful management of Cultural Heritage.

  1. 2024Site identification & feasibility, Complete
  2. 2025Cultural Heritage Engagement, Complete
  3. 2025Community & Stakeholder Engagement, Complete
  4. 2025Planning & Design, Complete
  5. 2025Technical & Ecological Assessments, Complete
  6. 2026Planning Approval, Complete
  7. 2026Ongoing Community Engagement, Complete
  8. 2026Detailed Design, Upcoming
  9. 2026Equipment Procurement, Upcoming
  10. 2026GPS Approval & Connection Agreement, Upcoming
  11. 2027Construction Commences, Upcoming
  12. 2027Registration, Upcoming
  13. 2027Energisation & Commissioning, Upcoming
  14. 2028Commercial Operation, Upcoming
Artist impression of Nine Mile

Assessment

Planning Permit

On 28 May 2026, Pacific Green received planning permit for the Nine Mile Energy Park (Stages 1 and 2) from the Department of Transport and Planning (DTP). The applications were assessed under the Development Facilitation Program (DFP), which is a streamlined process for projects that deliver significant contribution to Victoria's economy, and provide substantial public benefits, including jobs for Victorians.

Under the DTP, the Minister for Planning is the decision-maker, and community input was a formal and important part of the planning process.

Full details of the assessment and the permit can be found on the DTP website or specifically at:

DTP's assessment report summarises the relevant planning considerations, issues raised and provided responses. This information, together with the planning application and assessment of technical studies, was considered by the Minister for Planning before the final decision was made to grant a permit.

The site

Project Location

Community Engagement

Community and Stakeholder Consultation and Engagement

Pacific Green is dedicated to creating a cleaner environment for our communities. We do this by delivering innovative energy storage solutions that enable Australia's net-zero transition. Our presence in regional Australia extends beyond the provision of clean energy solutions. We partner with communities where we deliver projects and support initiatives to develop wider social value creation beyond our core business.

Community Engagement

We are committed to providing clear, accessible information and inviting community input at every stage of the project. Our goal is to build respectful, transparent and lasting relationships with stakeholders, including Council, neighbouring landowners and the broader community.

Residents living near the project site will continue to be kept informed of key milestones, and Pacific Green will make every effort to share updates as our plans progress. We want to ensure that everyone can talk with us, ask questions, and provide feedback throughout the development process. There are several ways you can contact us:

  • Via the contact form below
  • Email: community.australia@pacificgreen.com
  • Call: 1800 018 529

Please get in touch if you want to register to receive project updates contact us using the contact form. We can meet in person at your residence, at a neutral location, or online, whichever option works best for you.

Our commitment to you

  • Our relationships within communities commence from the early stages of a project through to construction and operations.

  • From the outset we seek to establish open, transparent and collaborative two-way conversations to share our project plans, respond to questions and hear ideas the community might have to shape project design.

  • Every community is different, and we value the time people take to engage with us as it helps us shape our projects in a way that suits the differing environments we operate in.

Community Benefits

Pacific Green takes pride in becoming part of communities in which we operate. Our aim is to create social value and build stronger communities, right across Australia. We aim to enrich the quality of life for local communities through direct community benefits.

Pacific Green has been working with the community and Council to ensure we develop initiatives that deliver real impact to the region.

Local Employment Benefits

Pacific Green is committed to sustainably contributing to local employment and training while ensuring high labour standards.

During construction of our projects, employment opportunities naturally peak and at these times our approach is to maximise local direct employment and training opportunities. We prioritise hiring from within the local community to support regional economic development and growth.

Safety & sustainability

The safety of our employees and the communities in which we operate takes precedence in all we do.

In addition to first-class technical engineering that’s designed to meet International Electrotechnical Commission (IEC) and Australian Standards (AS), all Pacific Green energy storage projects undergo rigorous safety and security testing to minimise safety risks.

The Nine Mile Energy Park will come equipped with the latest lithium-ion battery technology incorporating several integrated fire safety measures. This will include both external monitoring and heat sensors as well as individual units within each battery container that are sealed and monitored with their own fire suppression systems. This means that if a single cell fails, this section of the battery is isolated and contained, thus protecting the rest of the container unit.

The operations will adhere to Nine Mile Energy Park's Bushfire Management Plan, Risk Management Plan, Fire Management Plan and Emergency Management Plan. These plans provide extensive details on potential risk areas and mitigation measures in place. These plans are reviewed regularly to ensure they are current.

The batteries have an initial lifespan of 25 years but new generation cell technology will provide longer lifespan, so that the site can be renewed and enhanced continually, making the project sustainable into the future.

Contact us

Please use the form below if you would like to reach out by email.

Phone
dedicated toll-free number
1800 018 529
Australia head office
Unit 1901, Level 19, 1 Macquarie Place, Sydney NSW 2000

Fields marked * are required.

We collect your details to respond to your enquiry. They are shared only with the project team. Our email provider may store them outside Australia. See our privacy policy.